Hospital Furniture

Pediatric Bed

Description Tubular Head and foot Bows of unequal height with vertical tube support Frame work made up to M.S. tubes Top made up of oval perforated CRCA M.S. sheet Legs fitted with PVC stumps Four location for I.V. Rod Full length drop side rails on both sides Finish: Pre treated & Epoxy Power Coated Overall approx size: 1460L x 830W x 600H mm Bed frame approx size: 1370L x 760W mm Optional Plain Mattress(MPB-1) S.S. Telescopic I.V. Road (TRAP-1) Full length S.S.Dide Rails

1 available models
Hospital Furniture business section
Quote only pricing on request
  • Tubular Head and foot Bows of unequal height with vertical tube support
  • Frame work made up to M.S. tubes
  • Top made up of oval perforated CRCA M.S. sheet
  • Legs fitted with PVC stumps
  • Four location for I.V. Rod
  • Full length drop side rails on both sides

Variant Matrix

Compare the model lineup at a glance.

This table surfaces the shared decision columns for the family so procurement teams can compare capacities, sizes, and configuration differences quickly.

ModelSizes no
PDB-1 Pediatric Bed15

Model Details

Switch between models for specification-level review.

Each model keeps its own attributes, supporting notes, and approved imagery under the same family page.

Model

PDB-1

Pediatric Bed
Model PDB-1
Size Pediatric Bed
s no 15

Supporting details

  • Description
  • Tubular Head and foot Bows of unequal height with vertical tube support
  • Frame work made up to M.S. tubes
  • Top made up of oval perforated CRCA M.S. sheet
  • Legs fitted with PVC stumps
  • Four location for I.V. Rod
  • Full length drop side rails on both sides
  • Finish: Pre treated & Epoxy Power Coated
  • Overall approx size: 1460L x 830W x 600H mm
  • Bed frame approx size: 1370L x 760W mm
  • Optional
  • Plain Mattress(MPB-1)
  • S.S. Telescopic I.V. Road (TRAP-1)
  • Full length S.S.Dide Rails

Related Families

More from Hospital Furniture.

These families sit in the same business section and are commonly reviewed together during planning and procurement.